Conference Day One: Monday 25 October 2010

07:45 Registration, Refreshments And Networking

08:30 Chairman’s Welcome And Opening Remarks

David Ball
Chairman
Concrete Bridge Development Group
and President Designate Concrete Society

Plans and forecasts for bridge projects in the Middle East

08:45 Acknowledging Abu Dhabi Municipality’s Strategic Vision For Infrastructure And Bridge Projects

  • Presenting the strategic vision of Abu Dhabi Municipality
  • Providing updates on the progress of various ongoing projects in Abu Dhabi
  • Identifying the plans and forecasts for ongoing and future bridge projects

H.E. Engineer Abdullah Al Shamsi
Acting Executive Director, Infrastructure & Municipal Assets Sector
Abu Dhabi Municipality

09:20 Assessing Recent Developments In Kuwait’s Infrastructure Projects

  • Identifying the current bridge projects and quantifying the scale of projects
  • Examining the design and construction issues facing the Subiya Causeway
  • Understanding the latest advancements of the Subiya Causeway

Eng. Mohannad Al Khayat
Director, Design Department, Road Affairs Sector
Ministry of Public Works, Kuwait

09:55 PANEL DISCUSSION: Developing Strategic Infrastructures Projects Within The Region

  • Preparing the master plan and consolidated budget of infrastructure projects
  • Assessing key challenges in meeting project requirements and deadlines
  • Assessing the qualification of consultants and contractors Panelists will include speakers of the day and a Parsons representative

Panelists will include speakers of the day and Hamed Zaghw, Senior Vice President, Parsons

10:30 Morning Break, Networking And Refreshments

Reviewing the latest practices and future trends in bridge design and construction

11:00 Exploring The Future Trends In Bridge Design In The Middle East

  • Assessing the techniques used in large bridge projects in the region
  • Identifying innovative design solutions to cope with the hostile climate
  • Recommending design practices that could be adopted for future bridge projects

Jesper S. Damgaard
Managing Director
COWI Dubai

11:35 Identifying The Latest Practices For Concrete Bridge Design

  • Understanding the role of concrete in sustainable structures
  • Assessing the new methods and requirements for concrete bridge design
  • Learning from the best practices in concrete bridge design

David Ball
Chairman
Concrete Bridge Development Group
and President Designate
Concrete Society

12:10 Reviewing Design And Construction Regulation In The Middle East

  • Understanding the impact in the region of the withdrawal of British Standards and the introduction of Eurocodes
  • Identifying design code options and their applicability and benefits to the Gulf region
  • Assessing the importance of compliance with product and workmanship requirements to achieve target reliability
  • Acknowledging what other non-European countries are doing with respect to adopting or adapting Eurocodes

Chris Hendy
Head of Bridge Design and Technology, Highways and Transportation
Atkins

12:45 Lunch Break And Networking Opportunity

Overcome the challenges in bridge design and construction

13:45 Managing Bridge Projects In The Middle East

  • Analysing function versus form
  • Determining how bridges support an integrated infrastructure plan
  • Exploring the management and coordination of different procurement strategies

Tim Risbridger
Partner
EC Harris International Ltd

14:20 Maximising Long-Term Value For Investment – The Importance Of Careful Selection Of Key Bridge Components And Use Of Modern Technologies

  • Understanding the increasing requirements on bridge components such as bearings and expansion joints
  • Short-term savings at the price of future problems – the false economy of an approach often taken
  • Examining the contribution of modern automated monitoring technologies to efficient bridge analysis and maintenance

Gianni Moor
COO
Mageba Switzerland

Niculin Meng
Area Manager
Mageba Switzerland

14:55 CASE STUDY: Analysing The Challenges In Designing And Constructing The Sheikh Zayed Bridge

  • Bridging the gap between architectural conception and engineering realisation
  • Reviewing design development of an awe inspiring landmark
  • Examining construction challenges and solutions

Eng. Mohamed Al Ameri
Project Manager, Head of Transportation Coordination Section
Abu Dhabi Municipality

Vardy Jones
Managing Director
High-Point Rende

15:30 Identifying Innovative Post-Tensioning And Stay Cable Technologies.

  • Ensuring durability and longevity of post-tensioned and cable stayed structures.
  • Acknowledging the evolution of stay cable technology and current guidelines used for the design, detailing and testing of stay cable systems.
  • Examining post-tensioning and cable stayed techniques.

Marcel Poser
CEO
BBR VT International

16:05 Afternoon Break, Networking And Refreshments

16:40 CASE STUDY: Bahrain's First Precast Segmental Concrete Viaduct - Isa Town Gate Interchange Project

  • Designing and constructing Bahrain's first precast segmental concrete viaduct
  • Identifying the challenges of constructing a three-level, gradeseparated interchange in a highly congested urban area
  • Assessing the effect of the global banking crisis on the project

Dr. Mostafa A. Hassanain
Head, Bridge & Flyover Projects, Roads Projects & Maintenance Directorate
Ministry of Works Manama, Bahrain

17:15 CASE STUDY: Learning From The Design Of Interchanges In The Dammam Area, Kingdom Of Saudi Arabia

  • Identifying techniques of three level interchanges
  • Assessing the effects of soil type on foundation systems
  • Evaluating the effects of underground water on underpass design

Dr. Jaber M. Alsiwat
Vice President
Saudi Consulting Services (Saudconsult)

Eng. Yousef Alshawaf
Chief Structural Engineer
Saudi Consulting Services (Saudconsult)

17:50 Final Comments From The Chair

18:00 End Of Conference Day One