Conference Day One: Monday 23rd November 2009

08:15 Registration, Coffee And Networking

08:45 Chairman’s Welcome And Opening Remarks

Building bridges in the Middle East - an overview

09:00 Keynote Opening Session: An Industry Forecast On Major Projects And A Detailed Insight Into The Qatar-Bahrain Causeway Project

  • An insight into bridge projects across the Gulf region
  • Understanding the intricacies of designing and constructing the world’s largest bridge
  • Analysis of the conceptual and preliminary design
  • Combating design and technology challenges with innovative solutions

Rick Haggett
Executive Director
QATAR-BAHRAIN CAUSEWAY MANAGEMENT (QBCM)

Designing, planning and integrating bridge projects

09:30 Case Study: Abu Dhabi Department Of Transport’s Vision For Bridge Projects Implementation

  • Completing bridge projects in the quickest amount of time without sacrificing safety and quality
  • Selecting resources to reduce carbon emissions
  • Understanding the unique environmental demands and the latest solutions in the industry
  • Bridge planning and design case studies

Parviz Djahani
Highways Infrastructures Consultant
DEPARTMENT OF TRANSPORT, ABU DHAbI, UAE

10:00 An International Exploration Of Global Mega Projects - A Series Of Mini Case Studies

  • Case studies include the Stonecutters Bridge (Hong Kong), the Fourth Replacement Crossing (Scotland) Hong Kong-Zhuhai- Macau Bridge, Incheon Bridge, (Korea)
  • Understanding the holistic challenges and complications of long-span bridges
  • New approaches to the geometric control of long-span bridges
  • Examining different bridge types, from small boutique structures to large fixed link projects

Naeem Hussain
Leader of Global Bridge Business
ARUP

10:30 Value Engineering And Integrating Design With Construction For The World’s Longest Cable Stayed Bridges: Sutong And Stonecutters’ Experience

  • The Value Engineering Process – benefits reaped by both the Client and Constructor
  • State of the Art of Construction Engineering for the World’s Longest Cable-Stayed Bridges
  • Integrating Design with Construction – challenges to attempting a seamless operation.

Dr. Robin Sham
AECOM Director for Global Long Span and Specialty Bridges
AECOM

11:00 Networking Break

11:30 An Integrated Approach To Bridge Mega Projects

  • Adopting a holistic strategy to bridge design
  • Considering the surrounding environment including; traffic, environment and aesthetics
  • Creating a strategic master plan to consider the socioeconomic impact

Jesper S. Damgaard
Managing Director
COWI DUBAI

Lars Hauge
Director for Bridges
COWI

12:00 Case Study: The Sheikh Rashid Bin Saeed Crossing - Creating The World’s Largest And Tallest Spanning Arch Bridge

  • Advancing the infrastructure and transportation initiatives in Dubai
  • Linking the cultural, commercial, and aesthetic challenges of building an iconic landmark
  • Exploring the technical and architectural solutions required

Steven W. Miller
Managing Director, Dubai
FX FOWLE

Sudhir Jambhekar
Senior Partner, New York
FX FOWLE

12:30 The Australian Gateway Bridge Upgrade Project

  • Discussing construction methods for both the approach and main spans
  • Illustrating equipment and erection details, post-tensioning tendon layout and details
  • Analysing design and construction details used on the project

Hans Rudolf Ganz
Chief Technical Officer
VSL GROUP

Building bridges bigger, better and faster

13:00 Reducing Construction Risk With Bridge Information Modelling

  • Advancing technology in bridge design and analysis
  • Re-using design data downstream, in fabrication, construction, O&M
  • Bridge Information Modelling (BrIM) – what could it do for you?

Stuart Spencer
Bridge Information Modelling Director EMEA
BENTLEY SYSTEMS

13:30 Networking Lunch

14:30 Case Study: The Sheikh Zayed Bridge (Abu Dhabi) - Design And Construction Of The World’s Most Complex Bridge

  • Bridging the gap between architectural conception and engineering realisation
  • Design development of an awe inspiring landmark
  • Examining construction challenges and solutions

John Dawson
Technical Director
HIGH-POINT RENDEL

Joe Barr
Chief Bridge Engineer
HIGH-POINT RENDEL

Vardy Jones
Managing Director
HIGH-POINT RENDEL

15:00 Understanding Best Practice In Stainless Steel Reinforcement For Bridges

  • Evaluating different stainless steel material types and grades for use as rebar
  • Considering example structures where stainless rebar has been used
  • Guidance documents for using stainless steel reinforcement

Graham Gedge
Metallurgist
ARUP MATERIALS CONSULTING (speaking on behalf of Arminox)

15:30 Networking Break

16:00 Comparison Of Different Bridge Construction Methods

  • Cost effective formwork systems for different bridge construction methods
  • New innovations in concrete technology for bridge construction
  • Application of early contractors involvement to bridge projects to improve cost effective design and implementation

Dr. Ulrich Klotz
Managing Director
ZüBLIN INTERNATIONAL GmbH

16:30 Innovative Bridge Design And Construction Techniques - A Series Of Case Studies

  • Understanding innovations and developments in cable stays
  • Exploring various suspension bridge case studies
  • Best practice construction methods, understanding successes and failures

Hassan Kanso
Commercial Manager for Major Projects
FREYSSINET INT., Paris

Vincent Bernier
Civil Works Manager
FREYSSINET MIDDLE EAST (Abu Dhabi-UAE)

17:00 Case Study: Saadiyat Bridge - The Construction Of One Of The Largest Infrastructure Projects In The UAE

  • Understanding the construction of the major elements
  • An overview of the construction challenges, including balanced cantilever cast-in-place and incremental launch methodologies

Frederic Turlier
Project Manager - Saadiyat Bridge
PARSONS

17:30 Case Study: Dubai Metro Viaducts - Building Precast Concrete Segmental Bridges

  • Exploring alternative methods of construction to reduce cost, time and environmental impact
  • Analysing best practice pre-cast systems
  • Understanding and planning for traffic

Dr. Ghassan Ziadat
Director of Infrastructure & Regional Head of Bridges, Middle East & India
ATKINS

18:00 End Of Conference Day One